Fictional demonstrationNot a customer result · not a site finding
illustrative Power Passport · PP-SAMPLE-001

12 MW inference site

Western U.S. · fictional inputs · example brief structure

BOUND DECISIONRESHAPE

Advance only if the utility and cooling gates clear. Test a 4 MW first stage before full-load commitments.

01 · executive decision

The site thesis is plausible, but the current evidence does not support a 12 MW commitment.

The useful next move is a smaller, flexible first stage paired with direct utility questions and a dry-cooling screen. This example does not infer substation capacity, an interconnection date, or environmental clearance.

Time-to-powerUNVERIFIED

Regional supply is visible, but site-level deliverability and interconnection timing are not established.

Flexible-load envelopeRESHAPE

Stage 4 MW first and retain at least 24 shiftable compute hours per week.

Hourly operating fitPARTIAL

The workload can move into favorable hours, but tariff and generation traces are still missing.

Biological capacityCONDITIONAL

Dry cooling lowers water exposure; heat, land, habitat, and permitting still require review.

02 · evidence ledger

Every conclusion keeps its evidence class.

KNOWN FROM THE SCENARIO
  • Western U.S. candidate site
  • 12 MW AI inference target
  • 24 shiftable hours per week
MODELED FOR THE SCREEN
  • 4 MW first stage
  • Dry cooling
  • Two-hour storage sensitivity
MUST BE VERIFIED
  • Utility deliverability and interconnection timing
  • Hourly tariff, generation, and curtailment
  • Water, heat, land, habitat, and permitting
03 · next diligence dollar

Questions for the next counterparties

  1. Utility: What capacity can be studied at this point of interconnection, on what timeline, and under which study process?
  2. Compute operator: Which workloads can pause, shift, or curtail without breaking service commitments?
  3. Cooling engineer: What dry-cooling performance and parasitic load should be expected at local design temperatures?
  4. Environmental team: Which water, heat, land, habitat, and permitting constraints require field verification?
one site · one workload · one decision

Turn a real blocked decision into a sourced brief.

Structured evidence ledger · operator-reviewed decision brief · target five business days after the agreed source material is confirmed.

Open the Power Atlas

This fictional sample demonstrates format and evidence boundaries only. A paid Power Passport uses current public records and customer-authorized material for the accepted scope. It remains pre-feasibility decision support—not engineering, confirmed utility capacity, an interconnection study, or legal, tax, financial, investment, permitting, or environmental advice.